QLD WINNER 2019

Construction\Engineering  
Telegraph Road Stage 2 | Brisbane City Council
QLD WINNER 2019
The Telegraph Road Stage 2 project is the final stage of works in the Telegraph Road corridor upgrade and was officially opened on 7 December 2018. The Stage 2 works included upgrading approximately 2.1 km of two-lane carriageway to four lanes with additional turning lanes at intersections and the removal of 12,000 tonnes of contaminated material to construct a new four-lane, 72 metre bridge over Cabbage Tree Creek, while maintaining a significant local traffic network. The project also had 34 frontline residents, several businesses and three adjacent projects under construction during the works, such as the Gateway Upgrade North project.

2019-QLD-Construction-winner-Brisbane-City.jpg